DUMP TRAILER Electrical power UNIT- SINGLE ACTING
General Description
This electrical power unit has a energy up gravity down circuit. Get started the motor to lengthen the cylinder and activate the solenoid valve to retract the circuit. Guide override to solenoid valve could be presented if expected. Also a pressure compen sated movement control may be added towards the circuit to manage the descent velocity of the cylinder.
Remark: Please consult our revenue engineer for that distinct pump displacement, motor power or tank capacity.
Distinctive Notes
1. This energy unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean the many hydraulic parts concerned in advance of set up of the electrical power unit.
three. Viscosity on the hydraulic oil shoud be 15~46 cst,which really should also be clean and totally free of impurities.N46 hydraulic oil is encouraged.
4. The electrical power unit need to be mounted horizontally.
five. Check the oil degree within the tank immediately after the preliminary running of the electrical power unit.
6. Oil changing is needed after the preliminary a hundred operation hrs, afterwards after each and every 3000 hrs.

DUMP TRAILER Power UNIT-DOUBLE ACTING
General Description
This electrical power unit features a energy up electrical power down circuit with load holding on each A & B ports. A stress compensatred movement handle may be additional to circuit to control the decent speed on the cylinder.
Exclusive Notes
1. This energy unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
two. Clean the many hydraulic elements concerned in advance of installation of the energy unit.
3. Viscosity with the hydraulic oil shoud be 15~46 cst, which must also be clean and no cost of impurities. N46 hydraulic oil is advisable.
four. The electrical power unit need to be mounted horizontally.
5. Check the oil level from the tank immediately after the original running in the energy unit.
six. Oil transforming is needed immediately after the initial 100 operation hours, afterwards after each and every 3000 hrs.