General Description
Outfitted together with the zero leak bidirectional checking sole-noid valves, this electrical power unit is designed for the operation of two independent circuits. Which are respectively for your most important and subordinate platforms in the double scissors lift. Two cut-off valves are employed for reducing the machine manually in situation of electrical power reduction. If a lot more independent circuits are necessary for the application please get hold of us for availability.
Remark: one. Please seek the advice of our product sales engineer for that various pump displacement, motor electrical power or tank capability.
2. CSA or UL licensed motors are available upon request.
Special Notes
1. The AC motor is of S3 duty cycle, which could only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic parts concerned ahead of installation of the power unit.
3. Viscosity of the oil shoud be 15~46 cst,along with the oil really should be clean and absolutely free of impurities,N46 hydraulic oil is advised.
4. The power unit must be mounted vertically.
5. Check the oil level inside the tank soon after the original running of your electrical power unit.
6. Oil shifting is needed following the original 100 operation hrs,afterwards the moment each and every 3000 hrs.